Installation of steel formwork for the construction of reinforced concrete shear basement wall
Laying of basement slab steel rebars
Application of 1st layer (primer) of industrial flooring
Installation of rubber material and waterproofing of seismic joint between buildings
Grinding of freshly poured reinforced concrete slab with the use of special equipment (helicopter treatment) for the construction of industrial flooring
Partial pouring of reinforced concrete slab of overall area 1.000 sqm.
Installation of circular steel struts for the support of foundation pit between an 8-floor building and adjacent road, during construction of three basements (overall foundation depth approx. 14 m.)
Installation of steel rebars in internal basement shear wall covering perimetric diaphragm
Pouring of inclined reinforced concrete columns on 6th floor
Construction of marble wall cladding on building façade
Fitting of scaffolding and cantilevered supports outside the building
Suspension of load-bearing existing steel column by temporary support to welded steel beams
Coating of steel rebars in reinforced concrete column with corrosion inhibitor and installation of dowel bars coated with epoxy resin paste
Coating of steel rebars in reinforced concrete column with corrosion inhibitor and installation of dowel bars coated with epoxy resin paste
Construction of reinforced concret jacket column
Substitution of load-bearing brick wall with steel frame
Strengthening of reinforced concrete foundation flanged beam with jacket construction
Strengthening of reinforced concrete foundation flanged beam with jacket construction